Permissions

Prev Next

If you create a project you automatically have full permission to it. Permissions to other users can then be set without opening the project.

If the Project editor is closed, return to 12d Synergy Client, otherwise proceed to the Permission menu.

  • Select DESIGN HIGHWAY project










    Repeat the above steps for groups Drainage and Survey and set the permissions required.