Permissions
- 18 Sep 2023
- 1 Minute to read
- Print
- PDF
Permissions
- Updated on 18 Sep 2023
- 1 Minute to read
- Print
- PDF
Article summary
Did you find this summary helpful?
Thank you for your feedback
If you create a project you automatically have full permission to it. Permissions to other users can then be set without opening the project.
If the Project editor is closed, return to 12d Synergy Client, otherwise proceed to the Permission menu.
- Select DESIGN HIGHWAY project
Repeat the above steps for groups Drainage and Survey and set the permissions required.
Was this article helpful?